| May 18, 2023 | Landscape | Broken PVC fitting on irrigation system in Upper MiWok Park near the Labyrinth.
| Completed |
| July 29, 2024 | Landscape | Broken sprinkler system at golf cart gate if front of 1100-1101 Lafite Court. Me. Reynolds gardener Carlos repaired the broken supply line pipe, however we need to have the sprinkler control box(s) repaired asap?
| In-Progress |
| March 25, 2026 | Vineyards | Broken vineyard water line
At end of briones gate behind latour ave
Robert: This has been reported to the HOA office.
| Completed |
| September 26, 2021 | Landscape | Broken water line near lower Miwok park spotted this morning 7 am (Sunday 9/26) location near street
| Completed |
| March 3, 2026 | Club | Can the upper shades in the gym be closed during the early morning hours please? Or if they are not working, can they manually be closed? The sunlight is literally blinding and with people’s varying compromised vision/eye health issues, this is a real problem. Thank you.
Robert: The wall controller is having a bit of an issue. I will make it my task to go in the morning and lower daily, until corrected.
| Completed |
| December 3, 2025 | Club | Can we remove the empty signs and poles that were put in during Covid to park to pick food from the club.
They put new poles and signs in for Handicap Parking which looks great. They left the old ones from Covid!
Thanks
Ken
| In-Progress |
| May 18, 2026 | Tennis / Pickleball Court | Canvas on top of the gazebo between the pickleball & tennis courts is torn and not fully secured.
| Completed |
| February 2, 2021 | Bocce Court | Card reader at Trilogy Pkwy. /Bocce Courts pedestrian and golf cart gates not working.
| Completed |
| April 25, 2023 | Wine Barn | Center cutouts for Wine Barn outside tables are hazards. Most do not fit in holes, and they frequently fall through to the ground.
| In-Progress |
| February 29, 2020 | Club | Chest press machine in the gym: when the foot lever is depressed the left-hand hand grip bar does not advance as it is supposed to. Thank you.
| Completed |
| May 30, 2025 | Tennis / Pickleball Court | Clock at pickleball courts has stopped
| Completed |
| October 3, 2025 | Tennis / Pickleball Court | Clock at pickleball courts is running slow. This morning (Friday) it was 10 minutes behind.
Robert: A new battery was installed.
| Completed |
| June 18, 2025 | Tennis / Pickleball Court | Clock at the pickleball courts has stopped working.
A new outdoor clock was ordered on Tuesday, 6/17/25 through Amazon. ETA 5 days
| Completed |
| January 26, 2026 | Tennis / Pickleball Court | Clock facing pickleball courts has stopped.
We will check the batteries again.
Robert
| Completed |
| March 20, 2025 | Club | Clock in Men's Locker Room needs to be changed to daylight savings time.
| Completed |
| November 9, 2024 | Club | Clock in men’s locker room never changed after Daylight Savings Time
| Completed |
| February 18, 2026 | Tennis / Pickleball Court | Clock on pickleball court is gone. I think it fell down in the storm and broke.
Robert: A new clock has been ordered, 02/19.
02/20. New clock installed
| Completed |
| July 15, 2025 | Landscape | Clubhouse freestanding sign in landscape along roadway leading to the clubhouse is dilapidated and an eyesore. Is it possible to have it replaced sooner than later? Thank you! Celeste
| In-Progress |
| August 9, 2025 | Bocce Court | Cold water fountain at Bocce Courts has algae
growing in supply inlet, which is also restricting
water flow. HEALTH HAZARD!
| Completed |
| April 18, 2024 | Vineyards | Common area around the oak tree behind 1962 / 1960 Barbaresco (maybe more) is full of weeds. Please have them removed or cut short before they become a fire hazard.
Thank yoi.
| Completed |
| May 3, 2024 | Villages | Common area path between 1805 Moscato and 1807 Moscato is covered in weeds
| Completed |
| January 14, 2026 | Villages | Concerning the fence separating our lot from HOA property, the fence needs repair. Due to the post tipping to one side, the concrete rails have fallen. I placed a board between to keep the top rail from completely falling.
| In-Progress |
| January 24, 2023 | Villages | Contractor failed to paint a small portion (40 feet) of the inside surface of our wall cap and has not returned to finish the job. They did complete the whole section along Briones but failed to finish the painting of our cap along the orchard side of our property. Alll scraping and prep has been done, but no paint. I would be happy to point out the section which needs to be completed and/or give painters access to our property.
Thanks,
| Completed |
| November 23, 2024 | Pool | Could you please vacuum the hot tub? There’s a lot of dirt where you sit and on the bottom. Thanks.
| Completed |
| February 17, 2022 | Tennis / Pickleball Court | Could you rehang the sign on Court #2 / Tennis Court - it's on the ground next to the gate. Thank you!
| Completed |